Agree on the lift layout before the floor plan is finalised. Effective collaboration with architects on lift design starts by identifying priorities: accessibility, appearance, circulation, lift position, structural coordination and landing orientation. These decisions shape how the lift works within the home, not just where it fits.
It’s easy to focus on the lift itself, but its position and entrances affect the spaces people use every day. Agreeing on priorities early gives the architect and lift specialist a shared basis for coordinating the layout and avoiding late design changes.
This guide covers what to discuss first, from accessibility and aesthetics to circulation, lift placement, structural coordination and door orientation at each landing. It offers a practical framework for decisions that support both the building’s design and its everyday use.
Key Takeaways
- Agree on accessibility needs and visual priorities early so the lift supports daily use without feeling out of place.
- Coordinate circulation, shaft position and structural requirements before the building layout is finalised.
- Plan landing locations and door orientation around clear routes, nearby rooms and how people will approach the lift.
- Review lift details whenever connected building elements change, so the design stays coordinated as the project develops.
1. Balancing accessibility and architectural aesthetics
When planning to age in place, let accessibility shape the lift layout before choosing finishes. A lift can support movement between levels for a wheelchair user, an older family member or someone carrying household items. The architect can then coordinate its doors, controls and surrounds with the home’s materials and style. A discreet finish matters, but it must not obstruct an accessible approach or straightforward operation.
For an accessible home lift, the guidance used here gives a clear door width of at least 900 mm and a car of approximately 1100 × 1400 mm for a wheelchair user and attendant. It also gives an approximately 1800 × 1800 mm lobby. Treat these as layout-planning figures, then coordinate the selected equipment and applicable requirements. Automatic telescopic or sliding doors are specified rather than manual swing doors, which need space to open. Controls, handrails, visual indicators and audible signals should also be considered alongside the approach route.
What are the Australian lift and accessibility standards architects must consider? AS 1735 is an Australian Standard relevant to residential lift design and compliance. The design should also account for the accessibility provisions applicable to the building and its intended use.
What are the lift planning requirements under the National Construction Code? The applicable requirements depend on the building’s classification, use and access needs, so there isn’t one layout for every project. Coordinate the lift design with the relevant NCC provisions and AS 1735 as the plans develop.
Plan for servicing as part of the architectural layout. Keep equipment and service panels accessible instead of concealing them behind fixed joinery or finishes. A panel behind a built-in cupboard, for example, can make routine inspection difficult. Coordinate its position with the architect, electrical services and lift requirements before installation. This preserves practical maintenance access while allowing the panel and surrounding finishes to sit neatly within the design.
2. Early coordination of lift circulation, shaft placement and structure
Start lift coordination during concept design, before the home’s circulation routes and structural grid are fixed. The architect, builder, lift specialist and structural engineer need a shared set of project information. This includes floor plans, intended use, lift position, landing locations, shaft dimensions, pit and headroom requirements, structural openings, equipment loads and electrical services. These details help the team test whether a proposed home lift suits the building’s layout.
Capacity, speed and the number of lifts affect the space and infrastructure a building needs. Capacity should match who or what the lift is intended to carry, while speed and the number of lifts influence how the system serves circulation patterns. Architects should communicate the intended use and expected movement between levels, then coordinate the selected equipment’s requirements with the engineer and building layout.
For tender specifications, describe the intended performance and building interfaces, and assess each tender response against the same drawings and project assumptions. Common mistakes include reusing dimensions from a previous project or changing a floor build-up without reviewing connected lift details. Check the selected system’s requirements against structural documentation, and record drawing revisions and responsibilities.
From concept to construction documentation, first establish the lift’s purpose and position. Next, coordinate system requirements with the architect, builder and engineer. Then resolve shaft, pit, headroom, openings, services and access details in the relevant drawings. Review the coordinated information after changes to floors, supports or service routes, and carry agreed interfaces into tender and construction documents.
In Australia, architects need to provide the intended use, layout and building information that allows lift requirements to be coordinated with structural and electrical design. AS 1735 is relevant to residential lift design and compliance. In Great Britain, CDM 2015 guidance applies to designers, including architects, engineers and specialist contractors; it is not the governing framework for a Perth project.
Australian manufacturers and lift consultants can be brought into design coordination for system-specific equipment information. For a Perth home project, discussing lift layout with a specialist can help connect equipment choices with the architect’s plans.

3. Landing placement and door orientation
A lift landing should connect with the route people already use, not send them through a private room. On a two-storey home plan, compare the ground-floor entrance, stair and upstairs corridor before fixing each doorway. Aligning openings with clear circulation space helps passengers approach, exit and continue moving without crossing furniture zones. Show every landing on the floor plan, including the direction each door faces.
Door orientation affects more than the lift itself. An entrance facing a narrow hallway can conflict with room doors, furniture or turning space. For example, a lift door facing a bedroom entrance may make both areas harder to use when people pass through the landing. Coordinate door position with the lobby dimensions and adjoining walls. Check every served level, because the best approach downstairs may not work upstairs.
Door configurations vary by lift system, so don’t assume an arrangement from another project will fit. Compare the selected lift’s available entrance positions with the architect’s plans. A consistent direction can simplify circulation, while different orientations may suit a layout with access from adjoining sides. Record the agreed configuration clearly in the drawings before finalising construction details.
Finishes can help the lift sit naturally within the home’s architecture. Coordinate cab panels, doors, surrounding wall finishes and lighting as one composition. A door finish that matches nearby joinery, for example, can make the entrance feel integrated, while a contrasting finish can make it easier to identify. Keep visual choices separate from functional clearances, so trim does not narrow the approach or interfere with door movement.
Before approving the layout, review each landing from a passenger’s perspective: approach the entrance, wait, enter, exit and continue along the corridor. Check the door’s swing or sliding path, nearby room openings, furniture placement and finish transitions. Marking these details on the plans gives the architect and lift specialist a shared reference for resolving conflicts before installation.
4. Collaborating with architects on residential lift design
Good collaboration with architects on lift design starts with treating the lift as part of the residential brief, not an item added after the floor plan. Agree its purpose, intended users and relationship to the home’s circulation. A lift suited to one project may not suit another, because shaft dimensions, pit depth, headroom, electrical supply and installation access vary by system.
Involve the lift specialist in concept discussions while the architect can still adjust the layout. Together, the team can identify equipment requirements and clarify who designs, checks, installs and accepts each interface. This makes tender information more useful: drawings and specifications can describe the intended system, building openings, support requirements and services instead of leaving key assumptions unresolved.
Use a clear drawing review process. Identify each lift drawing by number, revision, date and purpose, so the architect, structural engineer and builder work from the same information. A change to a floor build-up, railing, support or service route should prompt a review of related lift details. Record agreed changes and update affected drawings before construction proceeds.
A practical coordination sequence is:
- Define the brief: document the lift’s intended use and the building levels it will serve.
- Coordinate the design: align equipment requirements with the architectural and structural layouts.
- Resolve interfaces: assign responsibility for openings, supports, services and access.
- Review changes: update lift information when related building details change.
Keep decisions specific to the selected equipment. Requirements for machine-room space, delivery access and construction sequencing can differ, so don’t copy details from a previous home without checking them. Escalators serve a different circulation purpose and are not a basis for residential lift assumptions. The principle is simple: agree interfaces early, then keep lift drawings coordinated as the design develops.
For support connecting equipment choices with a residential layout, discuss your lift design with a specialist.
Perth Lift Company
Perth Lift Company helps homeowners, architects and builders consider residential lift options while a layout is taking shape. Its range includes hydraulic elevators, gearless traction lifts, vertical platform lifts and stairlifts. As a Perth specialist in residential lifts and mobility solutions, the company can help connect lift selection with the home’s access needs, circulation and available space.
This is a useful next step when an architect is weighing lift placement, landing access or how a lift can fit the home’s design. Sharing the project layout and intended use gives Perth Lift Company a practical starting point for discussing suitable options alongside the architectural plans, ensuring smooth collaboration with architects on lift design.
For help discussing lift options for your project, contact Perth Lift Company.
Take the next step with a coordinated plan
Focus the next design conversation on decisions that will shape daily life: how the lift will support household routines, where it fits in the layout and how it works with the architecture. A clear brief gives the architect and lift specialist a practical starting point for considering options together.
Perth Lift Company offers SWIFT Pro Lifts, SWIFT Lite Lifts and Pneumatic Vacuum Elevators (PVE 30, 37, 52). Discussing these options as part of collaboration with architects on lift design can help connect the lift choice with your project’s layout and intended use.
Bring your plans and priorities into the conversation, whether you’re at concept stage or refining a residential design. Contact Perth Lift Company to discuss your lift project and take a considered next step towards a design that works for your home.
Frequently Asked Questions
What should architects agree with the lift specialist first?
Agree on the lift’s purpose, intended users and key building interfaces before refining the design. A home planned for wheelchair access, for example, has different priorities from one where the lift mainly supports movement between floors. Record decisions about the equipment, access, services and coordination responsibilities, then share the same project information with the architect, builder and structural engineer.
What should happen when the building design changes?
Review information affected by the change and update the coordinated drawings before construction proceeds. A revised floor build-up, support, railing or service route can alter related lift details. Record the change against the drawing number, revision, date and purpose, then circulate the update to the architect, builder and relevant engineers so everyone is working from the current design.
When should architects involve lift consultants in a building project?
Involve a lift specialist during concept design, before the architectural layout and structural grid are settled. Early input lets the project team consider equipment requirements while there is still room to adjust the plan. In Perth, this is especially useful for a new home or major renovation, where lift placement, access between levels and building services need to be considered together.
How much space, pit depth and overhead clearance do different lift types need?
Space requirements depend on the selected system, but Perth Lift Company’s advertised lifts are self-supporting and don’t require a pit, shaft or separate machine room. PVE30, PVE37 and PVE52 have external diameters of 750 mm, 950 mm and 1,338 mm respectively. These figures describe external diameter, not every clearance needed in a floor plan; use equipment-specific information for layout coordination.
How do architects coordinate lift shafts with structure, services and fire safety systems?
Coordinate structural openings and supports with the engineer, then align electrical services and lift controls with the project drawings. The architect should also coordinate relevant lift interfaces with the building’s fire and life-safety design. Perth Lift Company’s lifts comply with relevant Australian Standards, including AS 1735. Council or building approval may be required, so check with local authorities; plan annual servicing by qualified technicians.